The concepts you'll meet when evaluating and deploying an operations platform — one short definition each, with the Apus module where the concept lives.
The central book every journal entry lands in; the financial statements are all built from it, so an error in the GL is an error everywhere.
See the moduleTwo flows of money running in opposite directions: AP is what you owe suppliers, AR is what customers owe you.
See the moduleTracks acquisition cost, depreciation and transfers of assets; unlike EAM's physical asset register, FA looks at value.
See the moduleCosting against a pre-set standard and analysing the variance against actuals, instead of waiting for period end to find out.
See the moduleMatching figures between two sources — the books against the bank statement, the warehouse against accounting. This is what eats most of the close.
See the moduleOne posting produces several parallel sets of books (say IFRS and the local standard) without anything being entered twice.
See the moduleThe time unit you lock figures against. Once a period is closed, a new entry goes to the next one or through an adjustment that leaves a trail.
The external, statutory accounting layer: general ledger, receivables/payables, fixed assets, tax and period close.
See the moduleThe internal accounting layer that serves management: cost centers, profit centers, product costing, budgets and profitability analysis.
See the moduleThe unit that collects costs and the unit that measures profit — the foundation of every management report by department, plant or product line.
See the moduleA code that collects costs for a time-boxed effort — a campaign, an R&D run, an event — so it can be settled and allocated to the right place.
See the moduleRolling up the reports of multiple legal entities into one picture, eliminating intercompany transactions within the group.
See the moduleThe principle of recording revenue as performance obligations are fulfilled — critical for service contracts and long-running projects.
See the moduleInternational and local accounting standards. Companies with foreign ownership often have to report under both in parallel.
See the moduleManaging a contract end to end: drafting from a clause library, signing routes, obligations and renewal dates.
See the moduleThe total time from placing an order to having the goods in hand. Underestimating it is the most common cause of a stockout.
The buffer held against demand swings and late deliveries. Set it high and cash is tied up; set it low and the line runs dry.
What you can genuinely promise a customer for a given date, once the quantities already committed to other orders are subtracted.
See the moduleTwo ways of identifying goods: a batch for things made in runs, a serial number for each individual unit. The basis of all traceability.
See the moduleThe value sitting half-finished on the line. Growing WIP is usually the signature of a bottleneck.
See the moduleThe sequence of operations and standard times needed to make a product; together with the BOM it is enough to release a production order.
See the moduleCounting part of the warehouse on a rolling schedule instead of shutting down to count everything; keeps stock accuracy without stopping operations.
See the moduleThe life of physical assets: preventive maintenance, work orders, spare parts. EAM looks at the machine, FA looks at its value.
See the moduleInspection standards, inspection records, complaints and CAPA — tied back to the exact lot, machine and shift that produced the problem.
See the moduleThe chain from purchase request and approval, through the order and goods receipt, to the invoice and payment, with three-way matching.
See the moduleThe cycle that balances the sales plan against supply and manufacturing capacity, typically on a monthly cadence.
See the moduleComputes material requirements from the production plan: what is needed, how much, and by when.
See the moduleMRP for the distribution network: replenishing stock for each warehouse or point of sale based on demand forecasts.
See the moduleA product's material recipe. The EBOM reflects the design structure; the MBOM reflects how the factory actually assembles it.
See the moduleThe shop-floor execution layer: work orders, scheduling and real-time shop-floor data.
See the moduleManaging design versions and approved engineering changes (ECR/ECO) — the link between R&D and manufacturing.
See the moduleThe composite equipment performance index = availability × performance × quality. The factory's standard yardstick.
See the moduleIssuing stock by nearest expiry date first — mandatory for food, pharma and cosmetics.
See the moduleThe nonconformance-handling process: corrective action for what already happened, preventive action for what's about to.
See the moduleThe ability to follow a lot or serial number across the whole chain — from incoming materials to the product in the customer's hands.
See the moduleA lead is a contact whose need is still unqualified; an opportunity has cleared the bar to enter the revenue forecast.
See the moduleThe set of opportunities by stage, used to forecast next period's revenue instead of guessing by feel.
See the moduleThe rules that decide the selling price by customer, channel, quantity and timing — the most common place for margin to leak away.
A promotion run through the distribution channel; its cost has to be tied back to the right revenue to see which campaign actually paid.
See the moduleThe rep's call schedule across outlets; the raw data behind any measure of coverage.
See the moduleManaging leads, sales opportunities and the customer journey from first contact through after-sales care.
See the moduleManaging the distribution channel: distributors, sales routes, route orders and stock, promotions.
See the moduleA lead judged ready to pursue, either by marketing (MQL) or by sales (SQL).
See the moduleRecords, contracts, time, payroll and the whole employee lifecycle on a single personnel file.
See the moduleHours worked flow straight into the payroll run and into project cost, instead of living in three separate spreadsheets.
Measuring progress by the value actually completed, so you know a project is late or over budget before it ends.
See the moduleRescheduling when the same person has been committed to several jobs at the same time.
See the moduleThree management levels: a project (one deliverable) → a program (several projects sharing a goal) → a portfolio (all investments, prioritized by strategy).
See the moduleThe project's work decomposition tree — the unit for assigning work, measuring progress and collecting costs.
See the moduleThe frozen plan (scope, schedule, budget) used as the benchmark once the project is actually running.
See the moduleAn approval gate between project phases — resources for the next phase are only committed once the gate is passed.
See the moduleA goal-setting framework: one qualitative objective paired with measurable key results.
See the moduleA strategy map balancing four perspectives: financial, customer, process, and learning & growth.
See the moduleGive rights to roles and put people into roles, rather than granting rights person by person — the only approach that stays controllable at scale.
One identity across many systems; revoke it once and every door closes.
The log of who changed what, when, and the value before and after. The first thing an auditor asks for.
Approval and handling flows modelled as rules, instead of living in email threads and habit.
The technique that lets AI read your own data and answer with its sources, instead of answering from the model's memory.
Managing electronic documents: storage, permissions, versions, approval flows and e-signature.
See the moduleThe analytics layer: dashboards, alerts and forecasting on real-time operational data.
See the moduleDigitized internal administration: inbound/outbound correspondence, approval routing, meeting-room booking, electronic forms.
The pre-contract review that establishes whether the standard package really covers your operation; its outcome decides scope and price.
The day the new system starts running for real. Before it comes the parallel run; after it comes stabilization.
Running the new system alongside the old way of working for a full cycle, so the figures can be compared before the old system is retired.
Moving master data and opening balances over from the old system. The quality of the source data drives most of the project risk.
Real users running real scenarios to confirm the system does the job — not the project team signing off on its own work.
The full lifetime cost: implementation, use, maintenance, upgrades and the cost of leaving — not just the opening price.
The state where leaving costs so much that you stay. Owning your data and your source code is how you reduce it.
An enterprise resource planning system — business modules sharing one data layer.
A customer's private data space on the platform — fully isolated from every other customer.
The shared reference data of the whole system: customers, suppliers, materials, accounts — entered once, used by every module.
Contractual service commitments: uptime, and response times by incident severity.
Two post-incident recovery objectives: RTO is the maximum time until service runs again; RPO is the maximum amount of data that may be lost.
The moment of switching from the old system to the new one, within a transition window agreed in advance.
Book a demo for your industry — the Apus team presents with data, not with jargon.