Digitize the whole production flow — from planning and scheduling to shop-floor data — tied to inventory and quality.
Manual production planning, no real-time shop-floor data, suboptimal capacity and inventory — late orders and waste are hard to control.
Work orders, output per shift and machine downtime are recorded at the line, not copied off a paper board at the end of the day. Planning therefore schedules against the plant's real load, and the warehouse knows in advance which materials are about to be called.
How: Align EBOM ↔ MBOM; route ECR/ECO through approval, version and effectivity controls; link engineering documents from EDM.
How: Standardized BOM, routing, operations and work centers.
How: MRP/CRP planning for materials and capacity.
How: Release orders and record output and progress on the floor.
How: Sequencing, load balancing and priority for key orders.
How: Shop-floor data, OEE and productivity by shift.
How: Tied to inventory & quality, in-line inspection.
How: Multi-level product structures with versions and date-effective validity.
How: Operation sequence, work centres, standard times and changeover times.
How: Versioned design changes, so you know which batch ran on which revision.
How: Sequenced against real capacity — rush orders without breaking the plan.
How: Operators report output, scrap and downtime where the work happens.
How: From finished goods back to raw material and shift, in seconds.
How: Availability, performance and quality kept as three separate numbers.
How: Classified stops show whether hours went to material, changeover or breakdown.
How: Material, labour and depreciation attributed to the order that consumed them.
Apus reviews your processes and configures the module to your exact operations.
Move data from legacy systems and connect with other modules on one data layer.
Train your team, go live, and get ongoing support at the SLA tier you choose.
A production order is where the plan meets the floor: what to make, at which operation, from which materials — and when it closes, inventory, costing and the quality record all move with it.
Plan production optimally within real constraints.
Predict failures to maintain before downtime.
Optimize capacity and surface waste points.
It only starts when somebody remembers it and finds the time to sit down with it.
The business event starts it, not somebody's memory.
When a new production order joins the queue
To learn where things stand you ask a colleague to check, then to export a report.
Ask in your own words; the answer comes off the numbers already in the system.
“Which order should we run first today?”
Your strongest people spend the day on the same reconciliation as last week.
The repetitive half runs inside the permissions you granted; the decisions still stop with you.
for you to review
They sit on the very data layer above — and run inside the caller’s permissions.
Every transaction flows straight to connected modules on one data layer — no re-entry, no silos.
EBOM ↔ MBOM and approved engineering changes plug straight into the Idea-to-Launch flow with PM/PPM, QMS and Finance.
Yes. MES captures field data via device integration and computes OEE and productivity in real time.
From finished goods back to raw material, every step carries its lot/serial together with the storage location and the quality result.
MRP/CRP, work orders and inventory sit on one data layer, so a material shortage appears during planning rather than when an operator walks to the store.
Each plant keeps its own configuration but reports into one place — multi-plant, multi-branch, centrally managed.
Book a demo configured to your exact operations and scale.